MultiRoundBAGRS.jpg
Bay Area Garden Railway Society
 

bridge on lower track

03/30/2011 8:59 PM | Anonymous member (Administrator)
Showing the trailer at the annual meeting gained a new worker bee. Seth looked at the front of the lower track and knew he could build a half-circle, collapsible, steel bridge to connect the  two gates that fold down to the ground.  The goal is to be able to  travel with the two halves of the semi-circle on the outside of the trailer. When arriving at the show destination we'll assemble them onto the front by mounting them onto the trailer tongue. With this system no matter how sloped the parking lot we show in, the front lower loop will be at the right height. No legs are needed. Check out his progress at http://www.postmodern.com/~sja/hobbies/trains/bagrs/index.htm 

Copyright (c) 2007-2017 Bay Area Garden Railway Society, Inc., a 501 c(7) Not-for-Profit Social Club

Powered by Wild Apricot Membership Software